Construction
The new Dalaman International Terminal cost approximately $150,000,000 to complete and is the 3rd largest terminal building in Turkey. There are 12 boarding gates, 8 with covered airbridges. The apron was also re-designed, increasing space for remote stands. Consequently, the airport has capacity to handle up to 35 flights at any one time. In total, the terminal now a floor space of 95,000m2, compared with less than 45,000m2 prior to refurbishment.
Check-in and departures are based on the upper two levels, with arrivals using the lower two levels.
Parking facilities are available for up to 550 vehicles outside the terminal building.
Read more about this topic: Dalaman Airport
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)
“Theres no art
To find the minds construction in the face:
He was a gentleman on whom I built
An absolute trust.”
—William Shakespeare (15641616)
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)