Cushioning - Evaluation of Finished Package

Evaluation of Finished Package

Verification and validation of prototype designs are required. The design of a package and its cushioning is often an iterative process involving several designs, evaluations, redesigns, etc. Several (ASTM, ISTA, and others) published package testing protocols are available to evaluate the performance of a proposed package. Field performance should be monitored for feedback into the design process.

Read more about this topic:  Cushioning

Famous quotes containing the words evaluation of, evaluation and/or finished:

    Good critical writing is measured by the perception and evaluation of the subject; bad critical writing by the necessity of maintaining the professional standing of the critic.
    Raymond Chandler (1888–1959)

    Evaluation is creation: hear it, you creators! Evaluating is itself the most valuable treasure of all that we value. It is only through evaluation that value exists: and without evaluation the nut of existence would be hollow. Hear it, you creators!
    Friedrich Nietzsche (1844–1900)

    Some burn damp faggots, others may consume
    The entire combustible world in one small room
    As though dried straw, and if we turn about
    The bare chimney is gone black out
    Because the work had finished in that flare.
    William Butler Yeats (1865–1939)