Cougar Dam was completed in 1963 at a cost of $54.2 million and the two turbine units were completed in 1964. Cougar Dam is operated in coordination with Blue River Dam to control flooding, and since the completion of the dam, it is estimated that it prevented approximately $452 million in potential flood damages. The dam consists of a rock-fill embankment approximately 1,500 feet (460 m) long, a penstock to power two Kaplan turbines, an emergency spillway capable of a capacity of 76,140 cu ft/s (2,156 m3/s), a regulating outlet, and a diversion tunnel. The diversion tunnel was built to divert the South Fork McKenzie River during the construction of Cougar Dam, and the tunnel was later closed with a concrete plug once the construction of the dam was complete.

Read more about this topic:  Cougar Dam

Famous quotes containing the word background:

    I had many problems in my conduct of the office being contrasted with President Kennedy’s conduct in the office, with my manner of dealing with things and his manner, with my accent and his accent, with my background and his background. He was a great public hero, and anything I did that someone didn’t approve of, they would always feel that President Kennedy wouldn’t have done that.
    Lyndon Baines Johnson (1908–1973)

    Pilate with his question “What is truth?” is gladly trotted out these days as an advocate of Christ, so as to arouse the suspicion that everything known and knowable is an illusion and to erect the cross upon that gruesome background of the impossibility of knowledge.
    Friedrich Nietzsche (1844–1900)