Connacher Oil and Gas - Pod One

Pod One

Great Divide Pod One is Connacher's initial steam-assisted gravity drainage thermal recovery oil sands project. Pod One has a design steam generation capacity of 27,000 bbl/d. At its long-term target peak operating steam-oil ratio of 2.7, Pod One is expected to facilitate production of approximately 1,600 cubic metres (approximately 10,000 bbl/d) of bitumen over a project life of 25 or more years, before provision for turnarounds and minor interruptions.

Read more about this topic:  Connacher Oil And Gas