Concrete Slump Test - Interpretation of Results

Interpretation of Results

The slumped concrete takes various shapes, and according to the profile of slumped concrete, the slump is termed as true slump, shear slump or collapse slump. If a shear or collapse slump is achieved, a fresh sample should be taken and the test repeated. A collapse slump is an indication of too wet a mix. Only a true slump is of any use in the test. A collapse slump will generally mean that the mix is too wet or that it is a high workability mix, for which slump test is not appropriate. Very dry mixes; having slump 0 – 25 mm are used in road making, low workability mixes; having slump 10 – 40 mm are used for foundations with light reinforcement, medium workability mixes; 50 - 90 for normal reinforced concrete placed with vibration, high workability concrete; > 100 mm.

Collapse Shear True
In a collapse slump the concrete collapses completely. In a shear slump the top portion of the concrete shears off and slips sideways. In a true slump the concrete simply subsides, keeping more or less to shape.

Read more about this topic:  Concrete Slump Test

Famous quotes containing the words interpretation of and/or results:

    The interpretation of dreams is the royal road to a knowledge of the unconscious activities of the mind.
    Sigmund Freud (1856–1939)

    It amazes me when I hear any person prefer blindness to deafness. Such a person must have a terrible dread of being alone. Blindness makes one totally dependent on others, and deprives us of every satisfaction that results from light.
    Horace Walpole (1717–1797)