Comilla Model - Implementation

Implementation

To simultaneously address problems caused by the inadequacy of both local infrastructure and local institutions, the Model integrated four distinct components in every thana (sub-district) where it was implemented:

1. establishment of a training and development centre,

2. a road-drainage embankment works program,

3. a decentralized, small scale irrigation program, and

4. a two-tiered cooperative system, with primary cooperatives operating in the villages, and federations operating at thana level.

Considerable emphasis was placed on distribution of agricultural inputs and extension services, for example by helping farmers to grow potatoes in the sandy Comilla soil, and using cold storage technology.

Another key implementation challenge, Dr. Khan wrote, was to ensure that the four programs grew stronger at the same time in a mutually supporting way. In particular,

“… the relation between the Rural Works and Irrigation Programmes and the cooperatives is very close and vital. The first two develop the productive capacity of the land and increase the farmer’s income. The cooperatives safeguard the farmers from money lenders and enable them to modernize their farming methods. The cooperatives promote the accumulation of self-owned capital through thrift and they promote managerial and technical skill through training. Their ultimate aim is self-financing and self-management."

In the villages, the Academy introduced a number of pilot projects beginning in 1959. These pilot projects were guided by two goals: first, to provide a real-life learning situation for its trainees; and second, to devise pilot programmes and institutions which could serve as models capable of replication. In guiding and operating the projects, a set of principles and strategies were formulated as the bases for developing the pilot projects, resulting in a unique rural development approach.

Read more about this topic:  Comilla Model