Collins Class Submarine Replacement Project - Project History

Project History

Built during the 1990s and 2000s, the Collins-class submarines have a predicted operational life of around 30 years, with lead boat HMAS Collins due to decommission around 2025. The Submarine Institute of Australia released a report in July 2007 arguing that planning for the next generation of Australian submarines had to begin soon. In December 2007, a month after coming into office following the 2007 federal election, Minister for Defence Joel Fitzgibbon announced that planning for the Collins class replacement (designated SEA 1000) had commenced. The SEA 1000 project office was established within the Defence Materiel Organisation in October 2008, and is being jointly administered with Defence's Capability Development Group. In February 2009, Rear Admiral Rowan Moffitt was appointed as project head.

The 2009 Defending Australia in the Asia Pacific Century: Force 2030 white paper confirmed the replacement project, and announced that the submarine fleet would be increased to twelve vessels. Reasons for the increase presented in the white paper included the growing quantity and sophistication of Asian-Pacific naval forces (particularly submarine forces), the need to sustain submarine operations in any conflict, and the greater deterrent an increased submarine force would provide.

Originally, the planned timeline called for concept work to start in 2009, preliminary designs to be established between 2011 and 2013, then detailed design work completed in time for construction to start in 2016. This was to ensure that the new class would be in service before the Collins class began decommissioning in 2025. However, meetings between Moffitt and the National Security Committee to clarify concept details and intended capabilities, scheduled for November 2009, did not go ahead until March 2012. On 3 May 2012, the Australian government announced funding for the initial design phase. The initial phase will encompass studies to select the new submarines' design, Defence Science and Technology Organisation projects to establish parameters for propulsion, combat system, and stealth capabilities, along with initiating programs to develop the required industry skills for the actual construction. Under the revised timeline, the preliminary phase will conclude in 2013, with 'first pass approval' to be done by early 2014, and 'second pass approval' in 2017, after which construction will start.

With the project's early delays, the best case scenario for seeing the first new submarine enter service will be after 2030.

Read more about this topic:  Collins Class Submarine Replacement Project

Famous quotes containing the words project and/or history:

    They had their fortunes to make, everything to gain and nothing to lose. They were schooled in and anxious for debates; forcible in argument; reckless and brilliant. For them it was but a short and natural step from swaying juries in courtroom battles over the ownership of land to swaying constituents in contests for office. For the lawyer, oratory was the escalator that could lift a political candidate to higher ground.
    —Federal Writers’ Project Of The Wor, U.S. public relief program (1935-1943)

    In history the great moment is, when the savage is just ceasing to be a savage, with all his hairy Pelasgic strength directed on his opening sense of beauty;—and you have Pericles and Phidias,—and not yet passed over into the Corinthian civility. Everything good in nature and in the world is in that moment of transition, when the swarthy juices still flow plentifully from nature, but their astrigency or acridity is got out by ethics and humanity.
    Ralph Waldo Emerson (1803–1882)