College of DuPage - Future Expansion

Future Expansion

Pending a referendum on the November 2010 Ballot, the college plans on keeping the current tax rate where it is, where in turn, the college plans on constructing finishing the three-phase project for the Homeland Security Education Center. The planned expansion includes a parking structure as well as a fully modeled streetscape for Police-Fire-EMS-SWAT training. A parking structure on the eastern side of campus is also planned, as the campus is currently over-capacity with its parking spaces, and the campus will be brought to current with its level of support for the students. Once the construction is finished, the BIC will have shed its long-held steel facing and gold-tinted windows to make it a white structure with modern upgrades, the SRC will have an overhaul and facelift, making it look new again, and a new Conference Center, as well as the long-awaited update to the Seaton Computing Center will finally be done.

Read more about this topic:  College Of DuPage

Famous quotes containing the words future and/or expansion:

    All radio is dead. Which means that these tape recordings I’m making are for the sake of future history. If any.
    Barré Lyndon (1896–1972)

    We are caught up Mr. Perry on a great wave whether we will or no, a great wave of expansion and progress. All these mechanical inventions—telephones, electricity, steel bridges, horseless vehicles—they are all leading somewhere. It’s up to us to be on the inside in the forefront of progress.
    John Dos Passos (1896–1970)