CM-32 Armoured Vehicle - Design and Development

Design and Development

The project was launched in 2002, at a cost of NT$700 million (US$21.9 million).

Mass production started in 2007, with an initial order for 600 units. It is estimated that up to 1,400 CM-32s may end up being in operational service. The Armor of the CM-32 provides protection of 7.62mm AP rounds, while the frontal arc withstands 12.7mm AP rounds. NBC protection and fire suppression systems are also standard. The V-shaped hull provides protection from landmines and can withstand 12kg of TNT under any wheel. The CM-32 is armed with a 12.7mm machine gun in it's basic APC form. It can also house a 20mm chaingun or a 120mm mortar or a 105mm cannon.

Read more about this topic:  CM-32 Armoured Vehicle

Famous quotes containing the words design and/or development:

    With wonderful art he grinds into paint for his picture all his moods and experiences, so that all his forces may be brought to the encounter. Apparently writing without a particular design or responsibility, setting down his soliloquies from time to time, taking advantage of all his humors, when at length the hour comes to declare himself, he puts down in plain English, without quotation marks, what he, Thomas Carlyle, is ready to defend in the face of the world.
    Henry David Thoreau (1817–1862)

    As long as fathers rule but do not nurture, as long as mothers nurture but do not rule, the conditions favoring the development of father-daughter incest will prevail.
    Judith Lewis Herman (b. 1942)