Clementi MRT Station - Platform Screen Doors

Platform Screen Doors

As with most of the stations along the East West Line, it was initially built without platform screen doors to prevent commuters from falling onto the train tracks. After several successful test at Jurong East, Yishun and Pasir Ris and eventually, installation of the half-height screen doors started on 19 April 2010 and operations commenced on 16 August 2010. It was the 4th above-ground station to have Half-Height Platform Screen Doors installed and in operational with Bukit Gombak.

Read more about this topic:  Clementi MRT Station

Famous quotes containing the words platform, screen and/or doors:

    “I have never yet spoken from a public platform about women in industry that someone has not said, “But things are far better than they used to be.” I confess to impatience with persons who are satisfied with a dangerously slow tempo of progress for half of society in an age which requires a much faster tempo than in the days that “used to be.” Let us use what might be instead of what has been as our yardstick!”
    —Mary Barnett Gilson (1877–?)

    “The screen of supreme good fortune curved his absolute smile into a celestial scream.”
    —John Ashbery (b. 1927)

    “All out of doors looked darkly in at him
    Through the thin frost, almost in separate stars,
    That gathers on the pane in empty rooms.”
    —Robert Frost (1874–1963)