The dam was authorized as Foster Creek Dam and Powerhouse for power generation and irrigation by the River and Harbor Act of 1946. The River and Harbor Act of 1948 renamed the project Chief Joseph Dam in honor of the Nez Perce chief who spent his last years in exile on the Colville Indian Reservation. Because of its lack of fish ladders, Chief Joseph Dam completely blocks salmon migration to the upper Columbia River system.

Construction began in 1949, with the main dam and intake structure completed in 1955. Installation of the initial generating units was completed in 1958. Eleven additional turbines were installed between 1973 and 1979, and the dam and lake were raised 3 m (10 ft), boosting the capacity to 2,620 MW, making Chief Joseph Dam the second largest hydroelectric power producer in the United States.

Read more about this topic:  Chief Joseph Dam

Famous quotes containing the word history:

    the future is simply nothing at all. Nothing has happened to the present by becoming past except that fresh slices of existence have been added to the total history of the world. The past is thus as real as the present.
    Charlie Dunbar Broad (1887–1971)

    All history is a record of the power of minorities, and of minorities of one.
    Ralph Waldo Emerson (1803–1882)

    America is, therefore the land of the future, where, in the ages that lie before us, the burden of the World’s history shall reveal itself. It is a land of desire for all those who are weary of the historical lumber-room of Old Europe.
    Georg Wilhelm Friedrich Hegel (1770–1831)