Chief Joseph Dam - History

History

The dam was authorized as Foster Creek Dam and Powerhouse for power generation and irrigation by the River and Harbor Act of 1946. The River and Harbor Act of 1948 renamed the project Chief Joseph Dam in honor of the Nez Perce chief who spent his last years in exile on the Colville Indian Reservation. Because of its lack of fish ladders, Chief Joseph Dam completely blocks salmon migration to the upper Columbia River system.

Construction began in 1949, with the main dam and intake structure completed in 1955. Installation of the initial generating units was completed in 1958. Eleven additional turbines were installed between 1973 and 1979, and the dam and lake were raised 3 m (10 ft), boosting the capacity to 2,620 MW, making Chief Joseph Dam the second largest hydroelectric power producer in the United States.

Read more about this topic:  Chief Joseph Dam

Famous quotes containing the word history:

    It takes a great deal of history to produce a little literature.
    Henry James (1843–1916)

    Revolutions are the periods of history when individuals count most.
    Norman Mailer (b. 1923)

    In the history of the United States, there is no continuity at all. You can cut through it anywhere and nothing on this side of the cut has anything to do with anything on the other side.
    Henry Brooks Adams (1838–1918)