Centralized traffic control (CTC) is a form of railway signalling that originated in North America. CTC consolidates train routing decisions that were previously carried out by local signal operators or the train crews themselves. The system consists of a centralized train dispatcher's office that controls railroad interlockings and traffic flows in portions of the rail system designated as CTC territory. One hallmark of CTC is a control panel with a graphical depiction of the railroad. On this panel the dispatcher can keep track of trains' locations across the territory that the dispatcher controls. Larger railroads may have multiple dispatcher's offices and even multiple dispatchers for each operating division. These offices are usually located near the busiest yards or stations, and their operational qualities can be compared to air traffic towers.
Read more about Centralized Traffic Control: Background, Development and Technology, Operation, Suppliers
Famous quotes containing the words traffic and/or control:
“There was a girl who was running the traffic desk, and there was a woman who was on the overnight for radio as a producer, and my desk assistant was a woman. So when the world came to an end, we took over.”
—Marya McLaughlin, U.S. television newswoman. As quoted in Women in Television News, ch. 3, by Judith S. Gelfman (1976)
“If the technology cannot shoulder the entire burden of strategic change, it nevertheless can set into motion a series of dynamics that present an important challenge to imperative control and the industrial division of labor. The more blurred the distinction between what workers know and what managers know, the more fragile and pointless any traditional relationships of domination and subordination between them will become.”
—Shoshana Zuboff (b. 1951)