Cardiff Bay Barrage - Construction

Construction

Construction was undertaken by a Balfour Beatty / Costain Joint Venture. The electrical and control systems equipment was designed, installed and commissioned by Lintott Control Systems (Norwich). Construction started in 1994, following the successful passage of the Cardiff Bay Barrage Act of 1993 through the UK Parliament. The bill included provisions for compensation for any homes damaged by the barrage and a large wetland habitat for birds further east down the Bristol Channel. Features include a fish pass to allow salmon to reach breeding grounds in the River Taff and three locks for maritime traffic. Construction was completed in 1999 and shortly afterwards the barrage came into effect. The impounding of the River Taff and River Ely created a 2-square-kilometre (490-acre) freshwater lake.

Read more about this topic:  Cardiff Bay Barrage

Famous quotes containing the word construction:

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)