Because the proposed turbines are more than 3 miles (4.8 km) from shore, they are subject to federal jurisdiction. However, near-shore infrastructure including roads and power cables make the project subject to state and local jurisdiction as well. All necessary state and local pre-construction approvals were obtained by 2009. Major federal approvals were obtained May 17, 2010, with lease details, and construction and operation permits to be granted as the project proceeds.