Cape Flats Line - Operation

Operation

The line is made up of double 1,067 mm (3 ft 6 in) Cape gauge track, electrified with 3,000 V DC overhead catenary. Services are operated mostly by electric multiple units of Class 5M2.

Read more about this topic:  Cape Flats Line

Famous quotes containing the word operation:

    It is critical vision alone which can mitigate the unimpeded operation of the automatic.
    Marshall McLuhan (1911–1980)