Applications

The SEI published that 60 organizations measured increases of performance in the categories of cost, schedule, productivity, quality and customer satisfaction. The median increase in performance varied between 14% (customer satisfaction) and 62% (productivity). However, the CMMI model mostly deals with what processes should be implemented, and not so much with how they can be implemented. These results do not guarantee that applying CMMI will increase performance in every organization. A small company with few resources may be less likely to benefit from CMMI; this view is supported by the process maturity profile (page 10). Of the small organizations (<25 employees), 70.5% are assessed at level 2: Managed, while 52.8% of the organizations with 1001–2000 employees are rated at the highest level (5: Optimizing).

Interestingly, Turner & Jain (2002) argue that although it is obvious there are large differences between CMMI and agile methods, both approaches have much in common. They believe neither way is the 'right' way to develop software, but that there are phases in a project where one of the two is better suited. They suggest one should combine the different fragments of the methods into a new hybrid method. Sutherland et al. (2007) assert that a combination of Scrum and CMMI brings more adaptability and predictability than either one alone. David J. Anderson (2005) gives hints on how to interpret CMMI in an agile manner. Other viewpoints about using CMMI and Agile development are available on the SEI website.

CMMI Roadmaps, which are a goal-driven approach to selecting and deploying relevant process areas from the CMMI-DEV model, can provide guidance and focus for effective CMMI adoption. There are several CMMI roadmaps for the continuous representation, each with a specific set of improvement goals. Examples are the CMMI Project Roadmap, CMMI Product and Product Integration Roadmaps and the CMMI Process and Measurements Roadmaps. These roadmaps combine the strengths of both the staged and the continuous representations.

The combination of the project management technique earned value management (EVM) with CMMI has been described (Solomon, 2002). To conclude with a similar use of CMMI, Extreme Programming (XP), a software engineering method, has been evaluated with CMM/CMMI (Nawrocki et al., 2002). For example, the XP requirements management approach, which relies on oral communication, was evaluated as not compliant with CMMI.

CMMI can be appraised using two different approaches: staged and continuous. The staged approach yields appraisal results as one of five maturity levels. The continuous approach yields one of six capability levels. The differences in these approaches are felt only in the appraisal; the best practices are equivalent and result in equivalent process improvement results.