Cambridge Line - Infrastructure

Infrastructure

The line is double track throughout. Traction current is supplied at 25 kV AC using overhead line equipment overseen by York Electrical Control Room, with Neutral Sections at Cambridge junction, Litlington and Shepreth Branch junction. It has a loading gauge of W8 and a maximum line speed of 90 mph.

Read more about this topic:  Cambridge Line