California State Route 198 - Future

Future

Ground was broken on November 19, 2009 on a project that will widen the two-lane, 10-mile section of SR 198 between SR 43 and SR 99 into a four-lane expressway. The project will cost $91.4 million. It was expected to be completed in early 2012. However, in April 2012, red-tailed hawks were found to be nesting along the road, which could delay completion until November.

Read more about this topic:  California State Route 198

Famous quotes containing the word future:

    ... the loss of belief in future states is politically, though certainly not spiritually, the most significant distinction between our present period and the centuries before. And this loss is definite. For no matter how religious our world may turn again, or how much authentic faith still exists in it, or how deeply our moral values may be rooted in our religious systems, the fear of hell is no longer among the motives which would prevent or stimulate the actions of a majority.
    Hannah Arendt (1906–1975)

    Much that is natural, to the will must yield.
    Men manufacture both machine and soul,
    And use what they imperfectly control
    To dare a future from the taken routes.
    Thom Gunn (b. 1929)

    The future depends entirely on what each of us does every day ... a movement is only people moving.
    Gloria Steinem (b. 1934)