The JF-17 was primarily developed to meet Pakistan Air Force's (PAF) requirement of the for an affordable, modern multi-role combat aircraft as a replacement for its large fleet of Dassault Mirage III/5 fighters, Nanchang A-5 bombers, and Chengdu F-7 interceptors. It was also to have export potential as a cost-effective and competitive alternative to significantly more expensive Western fighters.

In 1999, Pakistan and China signed the contract to jointly develop the FC-1/Super 7. Initial difficulties in acquiring an avionics and radar package from Europe led to many problems, which was solved in 2001, when design of the airframe was "de-coupled" from the avionics. In 2003, the maiden flight of the first prototype occurred in China. The Pakistani designation "Super-7", meanwhile, were replaced with "JF-17". Later test flights with a modified design occurred in 2006. Deliveries to the PAF for further flight testing and evaluation began in 2007 and the aircraft's first public aerial display took place that year in Islamabad. The PAF officially inducted its first JF-17 squadron, No. 26 Squadron, on 18 February 2010 with fourteen aircraft.

The Block 1 JF-17 is expected to cost approximately US$ 15 million per unit, with Block 2 aircraft costing US$ 20-25 million. The PAF has a confirmed order for 150 JF-17s, which may increase to 250 aircraft.

Read more about this topic:  CAC/PAC JF-17 Thunder

Famous quotes containing the word design:

    If I knew for a certainty that a man was coming to my house with the conscious design of doing me good, I should run for my life ... for fear that I should get some of his good done to me,—some of its virus mingled with my blood.
    Henry David Thoreau (1817–1862)