Level tracks are arranged above and below the gradient to allow wagons to be moved onto the incline either singly or in short rakes of two or more.

On the incline itself the tracks may be interlaced to reduce the width of land needed. This requires use of gauntlet track: either a single track of two rails, or a three-rail track where trains share a common rail; at the centre of the incline there will be a passing track to allow the ascending and descending trains to pass each other.

Railway workers attach the cable to the upper wagon, and detach it when it arrives at the other end of the incline. Generally, special-purpose safety couplings are used rather than the ordinary wagon couplings. The cables may be guided between the rails on the incline by a series of rollers so that they do not fall across the rail where they would be damaged by the wheels on the wagons.

Occasionally inclines were used to move locomotives between levels, but these were comparatively rare as it was normally cheaper to provide a separate fleet of locomotives on either side of the incline, or else to work the level sections with horses.

On early railways, cable-worked inclines were also used on some passenger lines, for example at Cowlairs in Glasgow.

Read more about this topic:  Cable Railways

Famous quotes containing the word operation:

    Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.
    Francis Bacon (1560–1626)