Plans and Construction
- An upgrade to eight lanes is planned with urgent demand between Leverkusen and Cologne
- An upgrade to eight lanes is planned with urgent demand near Frankfurt
- The upgrade to six lanes from Aschaffenburg to Schlüsselfeld is also planned with urgent demand
- The section between Rottendorf and Kreuz Biebelried (4,0 km / 2,5 mi) is under construction since 2009 to late 2012.
- The upgrade to six lanes from Schlüsselfeld to Kreuz Fürth/Erlangen is planned with further demand
- An upgrade to six lanes near Regensburg is planned with urgent demand
Read more about this topic: Bundesautobahn 3
Famous quotes containing the words plans and, plans and/or construction:
“In order to become spoiled ... a child has to be able to want things as well as need them. He has to be able to see himself as a being who is separate from everyone else.... A baby is none of these things. He feels a need and he expresses it. He is not intellectually capable of working out involved plans and ideas like Can I make her give me...? If I make enough fuss he will...? They let me do ... yesterday and I want to do it again today so Ill....”
—Penelope Leach (20th century)
“One who winks the eyes plans perverse things; one who compresses the lips brings evil to pass.”
—Bible: Hebrew, Proverbs 16:30.
“The construction of life is at present in the power of facts far more than convictions.”
—Walter Benjamin (18921940)