Bundesautobahn 3 - Plans and Construction

Plans and Construction

  • An upgrade to eight lanes is planned with urgent demand between Leverkusen and Cologne
  • An upgrade to eight lanes is planned with urgent demand near Frankfurt
  • The upgrade to six lanes from Aschaffenburg to Schlüsselfeld is also planned with urgent demand
    • The section between Rottendorf and Kreuz Biebelried (4,0 km / 2,5 mi) is under construction since 2009 to late 2012.
  • The upgrade to six lanes from Schlüsselfeld to Kreuz Fürth/Erlangen is planned with further demand
  • An upgrade to six lanes near Regensburg is planned with urgent demand

Read more about this topic:  Bundesautobahn 3

Famous quotes containing the words plans and, plans and/or construction:

    “In order to become spoiled ... a child has to be able to want things as well as need them. He has to be able to see himself as a being who is separate from everyone else.... A baby is none of these things. He feels a need and he expresses it. He is not intellectually capable of working out involved plans and ideas like “Can I make her give me...?” “If I make enough fuss he will...?” “They let me do ... yesterday and I want to do it again today so I’ll....””
    —Penelope Leach (20th century)

    “We for a certainty are not the first
    Have sat in taverns while the tempest hurled
    Their hopeful plans to emptiness, and cursed
    Whatever brute and blackguard made the world.”
    —A.E. (Alfred Edward)

    “There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.”
    —William Shakespeare (1564–1616)