Bull Run Hydroelectric Project

The Bull Run Hydroelectric Project was a Portland General Electric (PGE) development in the Sandy River basin in the U.S. state of Oregon. Originally built between 1908 and 1912 near the town of Bull Run, it supplied hydroelectric power for the Portland area for nearly a century, until it was removed in 2007 and 2008. The project used a system of canals, tunnels, wood box flumes and diversion dams to feed a remote storage reservoir and powerhouse. The entire project was removed because of rising environmental costs. Marmot Dam on the Sandy River was demolished in 2007, and the Little Sandy Dam on the Little Sandy River was taken down in 2008.

Read more about Bull Run Hydroelectric Project:  History and Overview, Operations, Decommissioning

Famous quotes containing the words bull, run and/or project:

    Not only the bull attacks his enemies with curved horn, but also the sheep, when harmed fights back.
    Propertius Sextus (c. 50–16 B.C.)

    People can only live with their equals, and not even with them; for in the long run they cannot tolerate that someone is their equal.
    Johann Wolfgang Von Goethe (1749–1832)

    If we should swap a good library for a second-rate stump speech and not ask for boot, it would be thoroughly in tune with our hearts. For deep within each of us lies politics. It is our football, baseball, and tennis rolled into one. We enjoy it; we will hitch up and drive for miles in order to hear and applaud the vitriolic phrases of a candidate we have already reckoned we’ll vote against.
    —Federal Writers’ Project Of The Wor, U.S. public relief program (1935-1943)