British Rail Class 15 - Construction

Construction

The design and manufacture was a collaboration between several companies. BTH (the main contractor) provided electrical equipment, Paxman supplied the power units, and Clayton supplied bogies and superstructure, with the frame construction and final assembly taking place at Yorkshire Engine's Sheffield works. These ten locomotives, numbered D8200–D8209, entered service between November 1957 and November 1958.

The design showed sufficient promise for a repeat order for 34 more locomotives to be placed soon afterwards. These locomotives, numbered D8210–D8243 and built by Clayton at Hatton, Derbyshire, were delivered between October 1959 and February 1961.

Read more about this topic:  British Rail Class 15

Famous quotes containing the word construction:

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)