VCE Centre
Plans have existed since 2007 to modernise the Eastern Block. Funding limitations generally limited the capability of the crumbling infrastructure which had existed early on after the opening of the high school. Funding had not been secured until late 2008, and construction started in May 2009. Construction though did not involve the removal of the dating classrooms and science wing, but added the new centre in the space which existed between the administration area and the top of the E Corridor. It houses Year 12 locker space, a computer laboratory, VCE School Administration and, amenities for Year 12 students. The centre was officially opened on December 18, 2009.
A new car park for teachers has also been built at this time, replacing the grassed area in front of the school.
Read more about this topic: Brighton Secondary College
Famous quotes containing the word centre:
“Here in the centre stands the glass. Light
Is the lion that comes down to drink. There
And in that state, the glass is a pool.
Ruddy are his eyes and ruddy are his claws
When light comes down to wet his frothy jaws”
—Wallace Stevens (18791955)