Brighton Railway Works - British Railways and Closure

British Railways and Closure

In the decade after the nationalisation of British Railways(BR) in 1948 Brighton works was again used for new locomotive construction, being responsible for both design work and construction of several of the new BR Standard classes. At the time of the centenary of locomotive building in 1952 the works covered 9 acres (36,000 m2) and employed about 650 staff. However, under the modernisation plan for BR announced in 1954, Brighton Works was once again passed over. Locomotive building ceased in 1957, and locomotive repairs ceased the following year. The buildings were closed in 1962 and demolished in 1969. The motive power depot was officially closed 15 June 1961, but remained in use for stabling steam locomotives until 1964, and was demolished in 1966.

Read more about this topic:  Brighton Railway Works

Famous quotes containing the words british and/or railways:

    If this creature is a murderer, then so are we all. This snake has killed one British soldier; we have killed many. This is not murder, gentlemen. This is war.
    —Administration in the State of Sout, U.S. public relief program (1935-1943)

    There is nothing in machinery, there is nothing in embankments and railways and iron bridges and engineering devices to oblige them to be ugly. Ugliness is the measure of imperfection.
    —H.G. (Herbert George)