In the summer of 2007 a number of renovations were made to what was then called the Sommet Center at a cost of several million dollars. Renovations included changes to concession stands and public areas, as well as major changes to infrastructure. The most obvious change was the August 2007 replacement of the original center-hanging scoreboard (at a cost of $3.6 million) with a new scoreboard made by ANC Sports. The original analog scoreboard had become outdated and was no longer supported by the original manufacturer, making parts difficult to come by. The new scoreboard is referred to as the "megatron" by arena and Predators staff. In addition, the TV–media control room was renovated at a cost of $2.6 million.

During the summer of 2011, a new NHL-mandated ice and dasherboard system was constructed and installed in the arena. In addition, the south side of the upper concourse was redesigned as a "fan zone". The wall separating the arena and that part of the upper concourse was removed.

Read more about this topic:  Bridgestone Arena