Bowman (communications System) - Procurement History

Procurement History

The concept of Bowman dates from a 1989 UK MoD General Staff Requirement (GSR) for a system to replace the ageing Clansman radio system. The GSR was subsequently modified to accommodate post Cold War scenarios.

The procurement had a long and chequered history, with a number of consortia involved in the development and bidding process. This process culminated in the failure in 2000 of the preferred bidder, Archer, to deliver the requirement within budget and on time, and the resultant cessation of the contract by the UK MoD. The subsequent rebidding process for the contract was won by CDC Systems UK Ltd, now General Dynamics United Kingdom Ltd as prime contractor. Elements of design and manufacturing were sub-contracted to SELEX Communications (Military Specialist Communications), ITT Corporation, Harris Corporation, L-3 Communications, Blazepoint, DRS Tactical Systems, BAE Systems, GDC4S and Thales Group. AgustaWestland was responsible for training installations and classrooms for the conversion training. The procurement cost of the supply and (initial) support phase for Bowman is approximately £1.9 billion and the current acquisition cost of the whole project is £2.4 billion.

Bowman’s initial operating capability was delivered into service in March 2004, it was fully rolled out across the Armed Forces by the end of 2008 and is expected to continue in service until approximately 2026.

Read more about this topic:  Bowman (communications System)

Famous quotes containing the word history:

    The history of all hitherto existing society is the history of class struggles.
    Karl Marx (1818–1883)