In the early 20th century the economics of railroading began to change. With the advent of the internal combustion engine, trains slowly began to lose their advantage as a transportation option. Automobiles and trucks began to increase in popularity as highways improved, siphoning ridership and freight traffic off railroads. The advent of the Interstate Highway System tipped the economic balance by increasing mobility as factories and offices were now able to be located further away from the fixed routes of the railroads. The decline in both passenger and freight traffic occurred at a point when the B&M, like most other railroads, had just switched over to diesel locomotives, meaning that they had large debts. The pressure from the debts and the large infrastructure costs associated with operating a disparate passenger and freight network amongst declining traffic forced the B&M to cut costs. The most noticeable effect, to the general public, was the reductions in passenger operation. In the late 1950s the B&M began to eliminate routes and substituted Multi-Unit diesel-powered passenger cars on many of its routes. The effort did not succeed, as the B&M was bankrupt by 1976.

As it fortunes declined, the B&M shed its passenger operation in 1973 by selling the assets to the MBTA. The new state agency bought the Lowell line, along with the Haverhill and all other commuter operations in the Greater Boston area. Along with the sale, the B&M contracted to run the passenger service on the Lowell line for the MBTA. After bankruptcy, the B&M continued to run and fulfill its commuter rail contract under the protection of the Federal Bankruptcy Court, in the hopes that a reorganization could make it profitable again. It emerged from the court's protection when newly-formed Guilford Transportation Industries (GTI) bought it in 1983.

When GTI bought the B&M, commuter rail service was in jeopardy. The MBTA had owned the trains and the tracks since 1973, but it had outsourced the operation to the B&M. When GTI bought the B&M in 1983, it had to honor the B&M contract, but GTI management was very much against passenger rail, and, in 1986, as soon as the contract expired, they let the job go to Amtrak.

From 1986 until 2003, Amtrak managed the entirety of Boston's commuter rail. It did decently, though at times had strained relations with the MBTA. Quibbles centered on equipment failures, numbers of conductors per train, and who takes responsibility when trains are late. Because of these bad relations and Amtrak's repeated announcements that the contract was unreasonable, few people were surprised at Amtrak's decision not to bid again for the commuter rail contract when it came up for renewal in 2003.

When the MBTA asked for new bids on the commuter rail operation contract, Amtrak did not bid, but Guilford and the Massachusetts Bay Commuter Railroad Company did. The MBCR ended up getting the contract, and began operating the commuter rail in July 2004.

Guilford's main line between Mattawamkeag, Maine and Mechanicville, New York now uses the Stony Brook Branch and the old main line north of Lowell. At Lowell it shifts to the B&M's original Lowell Branch to get to the B&M main line towards Maine.

During the years since B&M bankruptcy, roadway congestion has increased significantly, resulting in growing demand for passenger and freight options. During this time frame, the MBTA has been slowly investing in some infrastructure changes in its rail operations. In 1995 a new North Station was opened. In 2001 it opened the Anderson Transportation Center on the Boston & Lowell to centralize ridership and provide a superstation with convenient access to Interstates 93 and 95 (Route 128). In southern Maine, frustration with bus service drove the state to explore restarting passenger service, resulting in contracting with Amtrak to operate the Downeaster, which runs from North Station to Haverhill and up to Portland. Due to scheduling conflicts with the MBTA, the Downeaster runs up the Lowell Line to Wilmington and then out the old B&M Wildcat Branch to the Haverhill/Reading Line. This route allows the Downeaster to pass a commuter train on the Haverhill/Reading Line without schedule conflicts. The route is also historically significant because it is the same route that the original B&M used to Portland.

Read more about this topic:  Boston And Lowell Railroad

Famous quotes containing the words modern and/or times:

    The modern nose, like the modern eye, has developed a sort of microscopic, intercellular intensity which makes our human contacts painful and revolting.
    Marshall McLuhan (1911–1980)

    There are times when words seem empty and only actions seem great. Such a time has come, and in the Providence of God America will once more have an opportunity to show the world that she was born to save mankind.
    Woodrow Wilson (1856–1924)