Birkenhead Dock Branch - Present Condition

Present Condition

Most of the trackwork is still in place, along the line. However, most of the sidings at Bidston Dock, and all of the sidings at Wallasey Bridge Road and Mollington Street Depot have been removed, though the track foundation remains serviceable in all of these places. The track from Bidston East Junction to Bidston station has been removed, however, here, the track foundation also remains serviceable. Further up the line, the tunnel from Birkenhead Town to Birkenhead Woodside has been partly infilled. Two of the four tracks in Haymarket Tunnel have been removed. Mollington Link bridge has been replaced and narrowed to a twin-track width. As yet, no track has been relaid onto Mollington Link bridge. Two platforms at Rock Ferry railway station are disused. The line is heavily overgrown with flora, along its entire duration. There has been a degree of flytipping at the line, in the centre of Birkenhead.

Read more about this topic:  Birkenhead Dock Branch

Famous quotes containing the words present and/or condition:

    In the present age, a man with harmonious ideas is regarded as out of touch.
    Mason Cooley (b. 1927)

    The difference between tragedy and comedy is the difference between experience and intuition. In the experience we strive against every condition of our animal life: against death, against the frustration of ambition, against the instability of human love. In the intuition we trust the arduous eccentricities we’re born to, and see the oddness of a creature who has never got acclimatized to being created.
    Christopher Fry (b. 1907)