In order to create antiprotons (mass ~938 MeV/c2) in collisions with nucleons in a stationary target while conserving both energy and momentum, a proton beam energy of approximately 6.2 GeV is required. At the time it was built, there was no known way to confine a particle beam to a narrow aperture, so the beam space was about four square feet in cross section. The combination of beam aperture and energy required a huge, 10,000 ton iron magnet, and a very large vacuum system.

A large motor/generator system was used to ramp up the magnetic field for each cycle of acceleration. At the end of each cycle, after the beam was used or extracted, the large magnetic field energy was returned to spin up the motor, which was then used as a generator to power the next cycle, conserving energy; the entire process required about five seconds. The characteristic rising and falling, wailing, sound of the motor-generator system could be heard in the entire complex when the machine was in operation.

In the years following the antiproton discovery, much pioneering work was done here using beams of protons extracted from the accelerator proper, to hit targets and generate secondary beams of elementary particles, not only protons but also neutrons, pions, "strange particles", and many others.

Read more about this topic:  Bevatron

Famous quotes containing the word design:

    If I commit suicide, it will not be to destroy myself but to put myself back together again. Suicide will be for me only one means of violently reconquering myself, of brutally invading my being, of anticipating the unpredictable approaches of God. By suicide, I reintroduce my design in nature, I shall for the first time give things the shape of my will.
    Antonin Artaud (1896–1948)