The gas storage will use a depleted gas reservoir. The working volume of the gas storage will be 4.1 billion cubic meters (bcm) and a volume of cushion gas would be 4.6 bcm. The gas storage will include 14 new wells to a depth of 3 kilometres (1.9 mi), 35 kilometres (22 mi) of pipeline and the gas treatment facility. The gas treatment and compression facilities are being designed as a zero-emissions plant. The project is expected to cost €800 million excluding the cost of cushion gas. In August 2009, Gazprom Export—the export unit of Gazprom—was contracted to supply the project's cushion gas in exchange for gas storage services and a participating interest in operations of the facility. The final investment decision was made in October 2009. Assuming all permits are obtained, construction will start in mid-2010 with drilling of the 14 new wells expected to start in 2011. Commercial operations will start due to resistance of local city councils in 2014 at the earliest.

Read more about this topic:  Bergermeer Gas Storage

Famous quotes containing the words technical and/or features:

    Where there is the necessary technical skill to move mountains, there is no need for the faith that moves mountains.
    Eric Hoffer (1902–1983)

    These, then, will be some of the features of democracy ... it will be, in all likelihood, an agreeable, lawless, particolored commonwealth, dealing with all alike on a footing of equality, whether they be really equal or not.
    Plato (c. 427–347 B.C.)