BPS-2
The Baltic Pipeline System-2 (BPS-2) is an under construction second trunk line of the system running from the Unecha junction of the Druzhba pipeline near the Russia-Belarus border to the Ust-Luga terminal on the Gulf of Finland with 172 kilometres (107 mi) long branch line to Kirishi oil refinery. The construction of the BPS-2 started on 10 June 2009.
Read more about this topic: Baltic Pipeline System