Baltic LNG - Technical Features

Technical Features

The project foresaw a capacity of 5–7.2 million tonnes of LNG per year, depending on whether one or two LNG trains would be built. The LNG plant was expected to cost US$3.7 billion and it was to become operational by 2012. The technically design of the project was done by Giprospetsgaz, a subsidiary of Gazprom, and KBR, a subsidiary of Halliburton. The LNG plant was to be supplied from the Russian unified natural gas grid, including from the onshore section of Nord Stream pipeline, and from the Shtokman field.

Read more about this topic:  Baltic LNG

Famous quotes containing the words technical and/or features:

    The best work of artists in any age is the work of innocence liberated by technical knowledge. The laboratory experiments that led to the theory of pure color equipped the impressionists to paint nature as if it had only just been created.
    Nancy Hale (b. 1908)

    These, then, will be some of the features of democracy ... it will be, in all likelihood, an agreeable, lawless, particolored commonwealth, dealing with all alike on a footing of equality, whether they be really equal or not.
    Plato (c. 427–347 B.C.)