Baltic Gas Interconnector - Feasibility Study

Feasibility Study

The feasibility study which was completed in 2001 included market assessment, seabed survey, offshore and onshore installations estimated total cost to be €225 million ($202.3 million). The pipeline was scheduled to become operational circa 2004–2005. Environmental impact assessment started in 2002. Authorization from Swedish government was given in 2004, by Denmark – in 2005. The last phase of authorization was to come from Germany, in 2006. The project has not been implemented yet.

During the initial stages of the project, gas was planned to transported from the North Sea which is now in depletion. Consequently, Russian gas has been considered as an alternative source for the pipeline. However, due to considerations for linking Nord Stream pipeline to Swedish pipeline network, implementation of BGI is being revisited.

Read more about this topic:  Baltic Gas Interconnector

Famous quotes containing the word study:

    In a famous Middletown study of Muncie, Indiana, in 1924, mothers were asked to rank the qualities they most desire in their children. At the top of the list were conformity and strict obedience. More than fifty years later, when the Middletown survey was replicated, mothers placed autonomy and independence first. The healthiest parenting probably promotes a balance of these qualities in children.
    Richard Louv (20th century)