At the start of the 21st century, with the endowment secured, the campus grounds were revamped with new fencing, a concession stand, and a new bowl stadium with terraced seating. After the completion of the Bowl project, Grzymski stepped down as president and Martin was appointed to succeed him. Martin would in turn be replaced as principal by Mr. Barry Brownlee. Brownlee had previously served as assistant principal under Martin, and was the first lay principal in school history.

At the end of the 2004-2005 school year, the first phase of a major facilities renaissance was begun. The Friary was reconstructed to better reflect the number of religious living on the grounds and the balance of the space provided room for the relocation of the Lawrence Cardinal Shehan Library to the second floor, adjacent to the academic wing of the building. The space previously occupied by the Library was renovated to house a new Fitness Center, with expanded weight training and wrestling room space. A center for the full-time athletic trainer was also added.

A grant provided funds for a rehabilitation of the Auditorium seating and in the summer of 2005, further renovations funded by a capital campaign provided a new faculty dining room, a relocated bookstore, conference rooms and offices for the development director, athletic director and alumni association. The science labs, school roof, tennis courts, and student lockers were also rehabilitated.

Read more about this topic:  Archbishop Curley High School

Famous quotes containing the words century and/or expansion:

    A good reputation is more valuable than money.
    Publilius Syrus (1st century B.C.)

    The fundamental steps of expansion that will open a person, over time, to the full flowering of his or her individuality are the same for both genders. But men and women are rarely in the same place struggling with the same questions at the same age.
    Gail Sheehy (20th century)