Apollo Lunar Surface Experiments Package - Deployment

Deployment

The ALSEP was stored in the LM's Scientific Equipment (SEQ) Bay in two separate subpackages. The base of the first subpackage formed the Central Station while the base of the second subpackage was part of the RTG. A subpallet was also attached to the second subpackage which usually carried one or two of the experiments and the antenna gimbal assembly. On Apollo 12, 13, and 14, the second subpackage also stored the Lunar Hand Tool Carrier (HTC). The exact deployment of experiments differed by mission. The following pictures show a typical procedure from Apollo 12.

Picture Description
Pete Conrad opens the SEQ bay doors through a system of lanyards and pulleys.
Alan Bean removes the second subpackage from the SEQ bay. This was accomplished by using the boom which can be seen extended and a pulley system to set it on the ground. By Apollo 17, astronauts felt that the use of the boom and pulley system complicated the operation. And as such, the entire system was removed for Apollo 17. On Apollo 11, Buzz Aldrin chose not to use the system because of a lack of time.
The first subpackage, which Conrad had removed from the SEQ bay earlier.
Bean lowers the RTG cask into a position where he can access it.
Bean is beginning to remove the dome off the RTG cask. He is using a specialized tool called the Dome Removal Tool (DRT). Note how he has already prepared the RTG for fueling and has already deployed the HTC. Conrad has already removed the subpallet from the RTG subpackage.
Bean discards the dome with the DRT still attached. Neither had a use afterward.
Bean is attempting to remove the fuel element from the cask using the Fuel Transfer Tool (FTT). Note one of the Universal Hand Tools (UHT) attached to the RTG subpackage. On Apollo 12, the fuel element stuck in the cask because of thermal expansion (Bean could feel the heat through his suit). Conrad pounded the side of the cask with a hammer while Bean successfully worked it loose. He then inserted it into the RTG and discarded the FTT.
Bean attaches the RTG subpackage to the carrybar in preparation for the traverse to the ALSEP deployment site. The carrybar would later be used as the mast for the antenna on the Central Station.
During the traverse to the ALSEP deployment site, Conrad took this picture. His shadow indicates that he is carrying the subpallet with one of the two UHTs.
Bean carries the ALSEP out to the deployment site.
Conrad holds the carrybar in his left hand while he releases the antenna gimbal assembly with a UHT.
This photo shows Jim Lovell training for Apollo 13. He is currently deploying a mock-up of the Central Station. The Station was spring-loaded. After releasing Boyd bolts, the top of the Station would spring up, deploying it. Note the various locations on top of it which held some of the experiments before deployment. They were also held down with Boyd bolts that were released with a UHT.

Read more about this topic:  Apollo Lunar Surface Experiments Package