Construction
On 14 August 1989, AMECON was awarded the tender to build the Blohm + Voss designed frigate. The frigates were to be constructed at the AMECON shipyard in Williamstown, Victoria (formerly Williamstown Naval Dockyard), but the modular design of the frigate allowed sections of the ships to be constructed throughout Australia and New Zealand, with final assembly in Williamstown. Each vessel was made up of six hull modules and six superstructure modules. All of lead ship Anzacs modules were assembled at Williamstown, but for later ships, the superstructure modules were fabricated in Whangarei, New Zealand, and hull modules were built at both Williamstown and Newcastle, New South Wales. Unlike previous shipbuilding contracts, AMECON was only contractually obliged to meet the navy's set commissioning dates for the ships; all other construction deadlines were to be determined at the shipbuilder's discretion.
The second and fourth ships to be built were allocated to the New Zealanders. The third and fifth ships to be produced were earmarked for the RNZN in the event that approval to order two more frigates was given, with two more ships for the RAN to be added at the end of the production run. Project offsets meant that construction costs for the New Zealand ships were about 20% less than the Australian vessels.
Steel cutting for the first ship, Anzac, commenced on 27 March 1992. Work on the first New Zealand ship, HMNZS Te Kaha, began in February 1993. Anzac commissioned into the RAN in May 1996, and Te Kaha into the RNZN in July 1997. In early 2002, the first four ships found to have microscopic cracks in the bilge keel and hull plating. The ships' hulls were repaired and reinforced. Construction of the final vessel, HMAS Perth, began in July 2003, with the vessel commissioning into the RAN in August 2006.
Read more about this topic: Anzac Class Frigate
Famous quotes containing the word construction:
“Theres no art
To find the minds construction in the face:
He was a gentleman on whom I built
An absolute trust.”
—William Shakespeare (15641616)
“Striving toward a goal puts a more pleasing construction on our advance toward death.”
—Mason Cooley (b. 1927)
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)