Andrew Oilfield - Cyrus and Farragon

Cyrus and Farragon

Cyrus and Farragon are two smaller satellite oil fields in the 16/28 Andrew block. Cyrus was originally produced in 1990 by OPV Seillean. It was then redeveloped along with the main Andrew project for restart as a subsea tieback in 1996. It produces through three horizontal wells (though one is presently shut in) and the unprocessed production fluids are piped through a riser to the platform where it is produced through its own process (for metering purposes). The separated products are then exported along with the rest of the Andrew export.

Farragon is a recent development. This small Palaeocene field is still being developed by a dedicated team at BP's North Sea headquarters in Dyce, though it has been producing through two wells since 2006. The produced fluids are transported directly to the export line without processing, though umbilical lines tie back to the platform.