Anderton Boat Lift - Operation After Conversion

Operation After Conversion

After conversion to electrical operation the boat lift was successfully operated for 75 years. Regular maintenance was still necessary. In particular, the wire ropes supporting the caissons suffered from fatigue as a result of repeated bending and straightening as they ran over the overhead pulleys, and had to be replaced quite frequently. However, the maintenance was simpler than before because the mechanism of the electrical lift was all above ground. It was also less expensive because the caissons were now designed to be run independently, so most maintenance operations could be carried out while one caisson remained operational, thus avoiding the need to close the lift entirely for any extended period.

Another regular maintenance job was repainting. The new superstructure of the converted lift was found to be susceptible to corrosion. To reduce this corrosion the entire lift was painted with a protective solution of tar and rubber, which had to be renewed every eight years or so.

During 1941 and 1942 the hydraulic rams of the original lift, which had been left in place in their shaft beneath the dry dock constructed during conversion, were finally removed in order to salvage the iron.

During the 1950s and 1960s the commercial traffic on British canals declined. By the 1970s the Anderton Boat Lift traffic was almost entirely recreational, and it was almost unused during winter months.

During repainting work in 1983 extensive corrosion was found in the lift's superstructure, and it was declared structurally unsound and closed.

Read more about this topic:  Anderton Boat Lift

Famous quotes containing the words operation and/or conversion:

    It is critical vision alone which can mitigate the unimpeded operation of the automatic.
    Marshall McLuhan (1911–1980)

    The conversion of a savage to Christianity is the conversion of Christianity to savagery.
    George Bernard Shaw (1856–1950)