Production
The Anaconda mine operated for 25 years and produced approximately 360 million tons of material from the pit. Most of the material remains in tailings or in leach heap piles. The copper was processed from the extracted ore using two processes. Copper oxide ore (from the upper portion of the pit) was processed by heap leaching, either directly with sulfuric acid in vats to produce a copper solution precipitated by passing it over scrap iron, or by leaching successively in acid and kerosene solutions, subsequently electroplating onto stainless steel sheets. Copper sulfide ore from the lower portion of the pit was processed by crushing, and flotation with calcium oxide added to the solution to maintain an alkaline pH.
Read more about this topic: Anaconda Copper Mine (Nevada)
Famous quotes containing the word production:
“The myth of unlimited production brings war in its train as inevitably as clouds announce a storm.”
—Albert Camus (19131960)
“The production of too many useful things results in too many useless people.”
—Karl Marx (18181883)
“Perestroika basically is creating material incentives for the individual. Some of the comrades deny that, but I cant see it any other way. In that sense human nature kinda goes backwards. Its a step backwards. You have to realize the people werent quite ready for a socialist production system.”
—Gus Hall (b. 1910)