Altoona Works - Major Facilities (1920s)

Major Facilities (1920s)

  • Altoona Machine Shops (renamed 12th St Car Shop in 1938)
    • Built steam locomotives during 1866-1904
    • Later in 20th century it handled locomotive repair and manufacture of engine parts
  • Altoona Car Shops
    • Built 1869
    • Manufactured freight cars and passenger cars
  • Juniata Shops
    • Built 1888-1890; expanded 1924-25
    • Built steam and electric locomotives during 1891-1946
    • Included a paint shop, boiler shop, blacksmith shop, boiler house, erecting shop, two-story machine shop, electric and hydraulic house, two-story office and storeroom, paint storehouse and gas house, and hydraulic transfer table and pit.
    • Repair work only in mid-20th century
    • Builds and remanufactures locomotives today
  • South Altoona Foundries
    • Manufactured cast iron and brass castings
Map of Altoona Works

Read more about this topic:  Altoona Works

Famous quotes containing the words major and/or facilities:

    Let’s just call what happened in the eighties the reclamation of motherhood . . . by women I knew and loved, hard-driving women with major careers who were after not just babies per se or motherhood per se, but after a reconciliation with their memories of their own mothers. So having a baby wasn’t just having a baby. It became a major healing.
    Anne Taylor Fleming (20th century)

    Marriage is good enough for the lower classes: they have facilities for desertion that are denied to us.
    George Bernard Shaw (1856–1950)