Technical Description
The diameter of the pipeline would be 1,420 millimetres (56 in). The designed capacity of the pipeline would be 30 billion cubic meters (bcm) natural gas annually and the total costs of the whole project is expected to be up to US$14 billion. The pipeline was expected to become operational in 2011, although there are some concerns that the real date would be 3–4 years later. The pipeline will be built and operated by TomskTransGaz, the subsidiary of Gazprom.
Read more about this topic: Altai Gas Pipeline
Famous quotes containing the words technical and/or description:
“Where there is the necessary technical skill to move mountains, there is no need for the faith that moves mountains.”
—Eric Hoffer (19021983)
“The great object in life is Sensationto feel that we exist, even though in pain; it is this craving void which drives us to gaming, to battle, to travel, to intemperate but keenly felt pursuits of every description whose principal attraction is the agitation inseparable from their accomplishment.”
—George Gordon Noel Byron (17881824)