Altai Gas Pipeline - Technical Description

Technical Description

The diameter of the pipeline would be 1,420 millimetres (56 in). The designed capacity of the pipeline would be 30 billion cubic meters (bcm) natural gas annually and the total costs of the whole project is expected to be up to US$14 billion. The pipeline was expected to become operational in 2011, although there are some concerns that the real date would be 3–4 years later. The pipeline will be built and operated by TomskTransGaz, the subsidiary of Gazprom.

Read more about this topic:  Altai Gas Pipeline

Famous quotes containing the words technical and/or description:

    In middle life, the human back is spoiling for a technical knockout and will use the flimsiest excuse, even a sneeze, to fall apart.
    —E.B. (Elwyn Brooks)

    God damnit, why must all those journalists be such sticklers for detail? Why, they’d hold you to an accurate description of the first time you ever made love, expecting you to remember the color of the room and the shape of the windows.
    Lyndon Baines Johnson (1908–1973)