Technical Description
The diameter of the pipeline would be 1,420 millimetres (56 in). The designed capacity of the pipeline would be 30 billion cubic meters (bcm) natural gas annually and the total costs of the whole project is expected to be up to US$14 billion. The pipeline was expected to become operational in 2011, although there are some concerns that the real date would be 3–4 years later. The pipeline will be built and operated by TomskTransGaz, the subsidiary of Gazprom.
Read more about this topic: Altai Gas Pipeline
Famous quotes containing the words technical and/or description:
“Woman is the future of man. That means that the world which was once formed in mans image will now be transformed to the image of woman. The more technical and mechanical, cold and metallic it becomes, the more it will need the kind of warmth that only the woman can give it. If we want to save the world, we must adapt to the woman, let ourselves be led by the woman, let ourselves be penetrated by the Ewigweiblich, the eternally feminine!”
—Milan Kundera (b. 1929)
“To give an accurate description of what has never occurred is not merely the proper occupation of the historian, but the inalienable privilege of any man of parts and culture.”
—Oscar Wilde (18541900)