The diameter of the pipeline would be 1,420 millimetres (56 in). The designed capacity of the pipeline would be 30 billion cubic meters (bcm) natural gas annually and the total costs of the whole project is expected to be up to US$14 billion. The pipeline was expected to become operational in 2011, although there are some concerns that the real date would be 3–4 years later. The pipeline will be built and operated by TomskTransGaz, the subsidiary of Gazprom.
Read more about this topic: Altai Gas Pipeline
Famous quotes containing the words technical and/or description:
“In effect, to follow, not to force the public inclination; to give a direction, a form, a technical dress, and a specific sanction, to the general sense of the community, is the true end of legislature.”
—Edmund Burke (17291797)
“I fancy it must be the quantity of animal food eaten by the English which renders their character insusceptible of civilisation. I suspect it is in their kitchens and not in their churches that their reformation must be worked, and that Missionaries of that description from [France] would avail more than those who should endeavor to tame them by precepts of religion or philosophy.”
—Thomas Jefferson (17431826)