Technical Description
The diameter of the pipeline would be 1,420 millimetres (56 in). The designed capacity of the pipeline would be 30 billion cubic meters (bcm) natural gas annually and the total costs of the whole project is expected to be up to US$14 billion. The pipeline was expected to become operational in 2011, although there are some concerns that the real date would be 3–4 years later. The pipeline will be built and operated by TomskTransGaz, the subsidiary of Gazprom.
Read more about this topic: Altai Gas Pipeline
Famous quotes containing the words technical and/or description:
“A technical objection is the first refuge of a scoundrel.”
—Heywood Broun (18881939)
“As they are not seen on their way down the streams, it is thought by fishermen that they never return, but waste away and die, clinging to rocks and stumps of trees for an indefinite period; a tragic feature in the scenery of the river bottoms worthy to be remembered with Shakespeares description of the sea-floor.”