Technical Description

The diameter of the pipeline would be 1,420 millimetres (56 in). The designed capacity of the pipeline would be 30 billion cubic meters (bcm) natural gas annually and the total costs of the whole project is expected to be up to US$14 billion. The pipeline was expected to become operational in 2011, although there are some concerns that the real date would be 3–4 years later. The pipeline will be built and operated by TomskTransGaz, the subsidiary of Gazprom.

Read more about this topic:  Altai Gas Pipeline

Famous quotes containing the words technical and/or description:

    Where there is the necessary technical skill to move mountains, there is no need for the faith that moves mountains.
    Eric Hoffer (1902–1983)

    Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built. Nor let us look down on the standpoint of the theory as make-believe; for we can never do better than occupy the standpoint of some theory or other, the best we can muster at the time.
    Willard Van Orman Quine (b. 1908)