Altai Gas Pipeline - Route

Route

The 2,800 kilometres (1,700 mi) long pipeline would start from the Purpeyskaya compressor station of the existing Urengoy–Surgut–Chelyabinsk pipeline. It would carry natural gas from Nadym and Urengoy fields in Western Siberia. Total length of Russian section will be 2,666 kilometres (1,657 mi), including 205 kilometres (127 mi) in Yamalo-Nenets autonomous region, 325 kilometres (202 mi) in Khanty–Mansi autonomous region, 879 kilometres (546 mi) in Tomsk Oblast, 244 kilometres (152 mi) in Novosibirsk Oblast, 422 kilometres (262 mi) in Altai Krai, and 591 kilometres (367 mi) in the Altai Republic. The terminal point in the Russian territory is the Kanas mountain pass. Large part of the pipeline will be built within the technical corridor of existing pipelines, such as the Urengoy—Surgut—Chelyabinsk, Northern Tyumen–Surgut—Omsk, Nizhnevartovsk gas refinery – Parabel, Parabel—Kuzbass, Novosibirsk—Kuzbass, Novosibirsk—Barnaul, and Barnaul—Biysk pipelines. In China, the pipeline would be terminated in the Xinjiang region, where it will be linked to the West–East Gas Pipeline.

Read more about this topic:  Altai Gas Pipeline

Famous quotes containing the word route:

    In the mountains the shortest route is from peak to peak, but for that you must have long legs. Aphorisms should be peaks: and those to whom they are spoken should be big and tall of stature.
    Friedrich Nietzsche (1844–1900)

    A Route of Evanescence
    With a revolving Wheel—
    Emily Dickinson (1830–1886)

    But however the forms of family life have changed and the number expanded, the role of the family has remained constant and it continues to be the major institution through which children pass en route to adulthood.
    Bernice Weissbourd (20th century)