Aktobe Central Stadium - Reconstruction

Reconstruction

After the stadium opened in 1975, the last reconstruction was in 2000, when plastic seating and the light-emitting diode board were installed. In 2005 the stadium met all UEFA standards. Heating system, water supply and the sewage were replaced. The press center area was expanded to 54 sq.m., and the dispatcher room to 21 sq.m. 142 bulbs in the floodlight system with a total capacity of 1800 watts were installed. The grass was replaced and an automatic watering system installed. Installation of under soil heating of the pitch started on April 28, 2011. This system is only used in early Spring and late Autumn (Fall) to assist grass growth.

Read more about this topic:  Aktobe Central Stadium