Advanced Combat Man System - History

History

The ACMS was first developed in 1998 as a joint project by the Singaporean Army and by the Defence Science and Technology Agency (DSTA) alongside ST Electronics and ST Kinetics under a Technology Exploration and Demonstration initiative in order to assess the possibility of simplifying capability and integration issues. It was succeeded in 2002 with a three-year Technology Consolidation and Development effort. Trials took place in 2006 with funding allocated to the Integrated Concept Development and Demonstration stage, which permitted the acquisition of 60 ACMS sets and ACMS sets and two CCIS equipped AFV platforms. Further trails took place in 2008 when Singaporean soldiers conducted live exercises at the Murai Urban Training Facility.

ST Electronics was chosen to be the main contractor responsible for the eventual production of the ACMS. Research and development of the ACMS was completed by 2012. Field tests began in January and March of 2010 when two Singaporean Army battalions were equipped with ACMS gear.

Read more about this topic:  Advanced Combat Man System

Famous quotes containing the word history:

    The history of the world is the record of the weakness, frailty and death of public opinion.
    Samuel Butler (1835–1902)

    There is nothing truer than myth: history, in its attempt to “realize” myth, distorts it, stops halfway; when history claims to have “succeeded” this is nothing but humbug and mystification. Everything we dream is “realizable.” Reality does not have to be: it is simply what it is.
    Eugène Ionesco (b. 1912)

    A great proportion of the inhabitants of the Cape are always thus abroad about their teaming on some ocean highway or other, and the history of one of their ordinary trips would cast the Argonautic expedition into the shade.
    Henry David Thoreau (1817–1862)