Aachen Central Station - Renovations

Renovations

The station hall was renovated from 2000 to 2006. In 2007 a new electronic signal box was built, enabling more streamlined operations and automatic switching of the correct voltages. The cost estimate for the revamp was around € 40 million. The main changes were:

  • Construction of 400m long platforms for international traffic, replacing the old 250m platforms that did not allow economic usage due to their limited length.
  • Special through tracks (tracks 3 and 4) for freight trains to the Netherlands and Belgium (via Montzen) to Aachen West.
  • Constructional changes to the system changeover point to Belgium; a new track layout, which allows the smooth changeover of electric locomotives and is capable of handling the increasing number of through carriages.
  • Improvement of the layout to remove operating problems, especially in the sidings.

Read more about this topic:  Aachen Central Station