By 2002, over 50% of the expressway ring route was opened to traffic, spanning from the northwestern end linking with the Badaling Expressway to the southern end linking with the Jingkai Expressway.

The 19.6 km northwestern segment (heading west) from Xishatun near Changping District to Wenquan in Mentougou District, and a 23.8 km portion connecting with the Jingshi Expressway and Liangxiang from the Jingkai Expressway were slated for November 2004. The portion Xishatun - Wenquan has been delayed until early 2005; despite this, the southern stretch opened on December 20, 2004.

The tallest viaduct so far for Beijing, that at the elevated crossroads of the 6th Ring Road with Jingzhou Road, has been completed. The 6th Ring Road soars a magnificent 13 metres over a Jingzhou Road of height 6 metres above ground. A very long bridge — Dingshui Bridge, 2,564 metres in length, is on this stretch of the road, too.

The remainder of the 6th Ring Road will tackle with the mountainous terrain in west Beijing's Mentougou District. A portion of the expressway will interlink directly with the district town of Mentougou.

Due to the tough hilly terrain in the west, completion in full of the 6th Ring Road was achieved by 2005. By early October 2004, a basic projected route appears to have been finalised.

Read more about this topic:  6th Ring Road (Beijing)

Famous quotes containing the words portions and/or construction:

    Man is in part divine,
    A troubled stream from a pure source;
    And Man in portions can foresee
    His own funereal destiny;
    George Gordon Noel Byron (1788–1824)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)