3801 - Construction

Construction

Built in 1943 by Clyde Engineering, 3801 was the first of 30 38 class locomotives built to haul express trains and replace the 36 class on these premium workings. 3801 - 3805 were built in Sydney by Clyde Engineering to a streamlined design, whilst the other 25 locos in the class were built by the NSWGR and were unstreamlined. Of the other 38 class locomotives, only the unstreamlined 3830 is still operational.

The 38 class were first conceived in 1938. They suffered many delays during construction - mostly due to World War II. 3801 was the first engine completed late 1942 and entered service in January 1943 to little fanfare. It became known at the time as the "Grey Nurse" due to its drab, all grey colour scheme - a wartime economy.

Read more about this topic:  3801

Famous quotes containing the word construction:

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)