EVAs
Start Date/Time | Duration | End Time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|
10 March 16:22 |
4 hours 49 minutes |
21:11 | Expedition 18 ISS Pirs |
Yuri Lonchakov Michael Fincke |
Installed the EXPOSE-R experiment, removed tape straps from a docking target on the Pirs docking compartment, inspected and photographed the exterior of the Russian portion of the station. |
19 March 17:16 |
6 hours 7 minutes |
23:23 | STS-119 ISS Quest |
Steven Swanson Richard R. Arnold |
Installed the S6 truss to the S5 truss, connected S5/S6 umbilicals, released launch restraints, removed keel pins, stored and removed thermal covers, and deployed the S6 photovoltaic radiator. |
21 March 16:51 |
6 hours 30 minutes |
23:21 | STS-119 ISS Quest |
Steven Swanson Joseph M. Acaba |
Advanced preparation of worksite for STS-127, installation of an unpressurised cargo carrier attachment system on the P3 truss, installation of a Global Positioning System antenna to the Kibo laboratory, and infrared imagery of panels of the radiators on the P1 and S1 trusses. Cargo carrier installation unsuccessful |
23 March 15:37 |
6 hours 27 minutes |
22:04 | STS-119 ISS Quest |
Joseph M. Acaba Richard R. Arnold |
Relocation of a crew equipment cart, complete the deployment of a cargo carrier, lubricated the station robotic arm's latching end effector B snare bearings, and finish swapping electrical relays to the station's gyroscopes. Cargo carrier deployment unsuccessful |
14 May 12:52 |
7 hours 20 minutes |
20:12 | STS-125 Atlantis |
John M. Grunsfeld Andrew J. Feustel |
HST servicing: Replaced the WFPC-2 with WFC-3, replaced the Science Instrument Command and Data Handling Unit, lubricated three shroud doors, installed SCM. |
15 May 12:49 |
7 hours 56 minutes |
20:46 | STS-125 Atlantis |
Michael J. Massimino Michael T. Good |
HST servicing: Replaced rate sensing gyroscopes, removed one of two batteries. |
16 May 13:35 |
6 hours 36 minutes |
20:11 | STS-125 Atlantis |
John M. Grunsfeld Andrew J. Feustel |
HST servicing: Replaced COSTAR with COS. Repaired ACS, performed get-ahead tasks from EVA-5. |
17 May 13:45 |
8 hours 2 minutes |
21:47 | STS-125 Atlantis |
Michael J. Massimino Michael T. Good |
HST servicing: Repaired Space Telescope Imaging Spectrograph. |
18 May 13:20 |
7 hours 2 minutes |
20:22 | STS-125 Atlantis |
John M. Grunsfeld Andrew J. Feustel |
HST servicing: Final HST servicing EVA, final EVA from Space Shuttle. Replaced second battery, installed FGS-3, replaced some insulation and a low-gain antenna cover. |
5 June 07:52 |
4 hours 54 minutes |
12:46 | Expedition 20 ISS Pirs |
Gennady Padalka Michael R. Barratt |
Prepared the Zvezda service module transfer compartment for the arrival of the Poisk module, installed docking antenna for the module, photographed antenna for evaluation on the ground, and photographed the Strela-2 crane. First use of the Orlan-MK spacesuit. |
10 June 06:55 |
12 minutes | 07:07 | Expedition 20 ISS Zvezda |
Gennady Padalka Michael R. Barratt |
Internal spacewalk in the depressurised Zvezda transfer compartment, replaced one of the Zvezda hatches with a docking cone, in preparation for the docking of Poisk, later this year. |
18 July 16:19 |
5 hours 32 minutes |
21:51 | STS-127 ISS Quest |
David Wolf Timothy L. Kopra |
JEF installed and P3 nadir UCCAS deployed. S3 zenith outboard PAS deploy postponed due to time constraints. |
20 July 15:27 |
6 hours 53 minutes |
22:20 | STS-127 ISS Quest |
David Wolf Thomas Marshburn |
Transferred Orbital Replacement Units (ORUs) from the Shuttle Integrated Cargo Carrier (ICC) to the External Stowage Platform-3 (ESP-3). Transferred materials included a spare high-gain antenna, cooling-system pump module and spare parts for the Mobile Servicing System. JEF Visual Equipment (JEF-VE) installation on the forward section was postponed due to time constraints. |
22 July 14:32 |
5 hours 59 minutes |
20:31 | STS-127 ISS Quest |
David Wolf Christopher Cassidy |
JPM preparation work, ICS-EF MLI, and P6 battery replacement (2 of 6 units). EVA was cut short due to high levels of CO2 in Cassidy's suit. |
24 July 13:54 |
7 hours 12 minutes |
21:06 | STS-127 ISS Quest |
Christopher Cassidy Thomas Marshburn |
P6 battery replacement (final 4 of 6). |
27 July 11:33 |
4 hours 54 minutes |
16:27 | STS-127 ISS Quest |
Christopher Cassidy Thomas Marshburn |
SPDM thermal cover adjustment, Z1 patch panel reconfiguration, JEM visual equipment (JEM-VE) installation (forward and aft), and JEM-LTA reconfigurations. S3 Nadir PAS (outboard) deployment postponed to later mission. |
1 September 21:49 |
6 hours 35 minutes |
2 September 04:24 |
STS-128 ISS Quest |
John D. Olivas Nicole P. Stott |
Prepared for the replacement of an empty ammonia tank on the station's port truss by releasing its bolts. Retrieved the MISSE-6 and EuTEF experiments mounted outside of Columbus, and stowed them in the Shuttle's payload bay for their return to Earth. Nicole Stott becomes the tenth woman to conduct a spacewalk. |
3 September 22:13 |
6 hours 39 minutes |
4 September 04:51 |
STS-128 ISS Quest |
John D. Olivas Christer Fuglesang |
Removed the new ammonia tank from the shuttle's payload bay and replaced it with the used tank from the station. The new tank, weighing about 1,800 pounds (820 kg), was the most mass ever moved by spacewalking astronauts. With this spacewalk, Christer Fuglesang became the first person, who is not from either an American or Russian space program, to have participated in four or more spacewalks. |
5 September 20:39 |
7 hours 1 minute |
6 September 03:40 |
STS-128 ISS Quest |
John D. Olivas Christer Fuglesang |
Prepared for the arrival of Tranquility by attaching cables between the starboard truss and Unity, the area where Tranquility will be installed. The spacewalkers also replaced a communications sensor device, installed two new GPS antennas, deployed the PAS on the S3 truss, and replaced a circuit breaker. |
19 November 14:24 |
6 hours 37 minutes |
21:01 | STS-129 ISS Quest |
Michael Foreman Robert Satcher |
Installed a spare antenna on the station's truss and a bracket for ammonia lines on Unity. Lubricated the grapple mechanism on the Payload Orbital Replacement Unit Attachment Device on the Mobile Base System and lubricated the snares of the hand of the station's Japanese robotic arm. Deployed the S3 outboard Payload Attach System. |
21 November 14:31 |
6 hours 8 minutes |
20:39 | STS-129 ISS Quest |
Michael Foreman Randolph Bresnik |
Installed the GATOR (Grappling Adaptor to On-Orbit Railing) bracket to Columbus and an additional ham radio antenna. Installed on the truss an antenna for wireless helmet camera video. Relocated the Floating Potential Measurement Unit that records electrical potential around the station as it orbits the Earth. Deployed two brackets to attach cargo on the truss. |
23 November 13:24 |
5 hours 42 minutes |
19:06 | STS-129 ISS Quest |
Robert Satcher Randolph Bresnik |
Installed a new High Pressure Gas Tank (HPGT) on the Quest airlock. Installed MISSE-7A and 7B on ELC-2. Strapped two micrometeoroid and orbital debris (MMOD) shields to External Stowage Platform #2. Relocated foot restraint, released a bolt on Ammonia Tank Assembly, installed insulated covers on cameras on mobile servicing system and Canadarm 2's end effector. Worked heater cables on docking adapter. |
Read more about this topic: 2009 In Spaceflight