2008 in Spaceflight - EVAs

EVAs

Start Date/Time Duration End Time Spacecraft Crew Function Remarks
30 January
09:56
7 hours
10 minutes
17:06 Expedition 16
(ISS Quest)
Peggy Whitson
Daniel M. Tani
Replace motor and bearing in solar array joint
11 February
14:13
7 hours
58 minutes
22:11 STS-122
(ISS Quest)
Rex J. Walheim
Stanley G. Love
Install Power Data Grapple Fixture on Columbus Originally to have been conducted by Walheim and Hans Schlegel, Love replaced Schlegel on medical grounds.
13 February
14:27
6 hours
45 minutes
21:12 STS-122
(ISS Quest)
Rex J. Walheim
Hans Schlegel
Replace depleted nitrogen tank
15 February
12:07
7 hours
25 minutes
20:32 STS-122
(ISS Quest)
Rex J. Walheim
Stanley G. Love
Install experiments on Columbus, load failed gyroscope onto Shuttle for return to Earth
14 March
01:18
7 hours
1 minute
08:19 STS-123
(ISS Quest)
Richard M. Linnehan
Garrett Reisman
Install Kibo ELM-PS and start Dextre assembly
15 March
23:49
7 hours
8 minutes
16 March
06:57
STS-123
(ISS Quest)
Richard M. Linnehan
Michael Foreman
Dextre assembly
17 March
22:52
6 hours
53 minutes
18 March
05:44
STS-123
(ISS Quest)
Richard M. Linnehan
Robert L. Behnken
Dextre assembly, install MISSE-6 experiment, and store spare parts outside the ISS MISSE installation failed
20 March
22:04
6 hours
24 minutes
21 March
04:08
STS-123
(ISS Quest)
Robert L. Behnken
Michael Foreman
Test heat shield repair techniques
22 March
20:34
6 hours
2 minutes
23 March
02:36
STS-123
(ISS Quest)
Robert L. Behnken
Michael Foreman
Store OBSS on ISS, retry MISSE-6 installation
3 June
16:22
6 hours
48 minutes
23:10 STS-124
(ISS Quest)
Mike Fossum
Ron Garan
Install JEM Pressurised Module, Inspect SARJ, retrieve OBSS.
5 June
15:04
7 hours
11 minutes
22:15 STS-124
(ISS Quest)
Mike Fossum
Ron Garan
Adjust covers on JEM, Inspect SARJ.
8 June
13:55
6 hours
33 minutes
20:28 STS-124
(ISS Quest)
Mike Fossum
Ron Garan
Replace nitrogen tank, inspect SARJ.
10 July
18:48
6 hours
18 minutes
11 July
01:06
Expedition 17
(ISS Pirs)
Sergei Volkov
Oleg Kononenko
Remove pyrotechnic bolt from Soyuz TMA-12 for inspection.
15 July
17:08
5 hours
54 minutes
23:02 Expedition 17
(ISS Pirs)
Sergei Volkov
Oleg Kononenko
Install docking targeting equipment, rotate exposed experiments
27 September
08:38
22 minutes 09:00 Shenzhou 7 Zhai Zhigang (full)
Liu Boming (stand-up)
Test spacesuit, collect experiment First Chinese EVA
18 November
18:09
6 hours
52 minutes
19 November
01:01
STS-126
(ISS Quest)
Heidemarie Stefanyshyn-Piper
Stephen G. Bowen
Transferred an empty nitrogen tank assembly from ESP3 to the shuttle's cargo bay, transferred a new flex hose rotary coupler to ESP3 for future use, removed an insulation cover on the Kibo Exposed Facility berthing mechanism, began cleaning and lubrication of the starboard SARJ, and replacement of its 11 trundle bearing assemblies.
20 November
17:58
6 hours
45 minutes
21 November
00:43
STS-126
(ISS Quest)
Heidemarie Stefanyshyn-Piper
Robert S. Kimbrough
Relocated the two CETA carts from the starboard side of the Mobile Transporter to the port side, lubricated the station robotic arm's latching end effector A snare bearings, continued cleaning and lubrication of the starboard SARJ Conducted on tenth anniversary of the launch of the ISS
22 November
18:01
6 hours
57 minutes
23 November
00:58
STS-126
(ISS Quest)
Heidemarie Stefanyshyn-Piper
Stephen G. Bowen
Completed cleaning and lubrication of all but one of the trundle bearing assemblies (TBA) on the starboard SARJ.
24 November
18:24
6 hours
7 minutes
25 November
00:31
STS-126
(ISS Quest)
Stephen G. Bowen
Robert S. Kimbrough
Completed replacement of trundle bearing assemblies on starboard SARJ, lubricated the port SARJ, installed a video camera, reā€installed insulation covers on the Kibo External Facility berthing mechanism, performed Kibo robotic arm grounding tab maintenance, installed spacewalk handrails on Kibo, installed Global Positioning Satellite (GPS) antennae on Kibo, photographed radiators, and photographed trailing umbilical system cables.
23 December
00:51
5 hours
38 minutes
06:29 Expedition 18
(ISS Pirs)
Michael Fincke
Yuri Lonchakov
Install Langmuir probe, EXPOSE-R and IPI-SM experiments. EXPOSE-R installation failed

Read more about this topic:  2008 In Spaceflight